hi ya
well got out grinder last night and started cutting only one stuff up didn't go far enough thru with that problem sorted I pulled the front off and this morning i placed it on the chassis and lined a couple of hole up and most of them lined up
yahhoooooooo now got to finish the tow point/bar and get some metal folded up and weld in place then home for gauges etc and body back to work and sort out roll cage thats becomming a pain thinking 40 mm 3mm wall section pipe bent at work but must go over cab but beable to remove cab without removing roll cage (I don't want much)
heres a couple of photos
ps sorry about the landy in the backround its NOT mine