AUSJEEPOFFROAD.COM Jeep News Australia and New Zealand - View Single Post - Bang Crunch
Thread: Bang Crunch
View Single Post
  #30  
Old 29-01-2017
ren0vator's Avatar
ren0vator  ren0vator is offline
Established Member
 
Join Date: Dec 2015
Location: Townsville
Posts: 481
Likes: 181
Liked 169 Times in 116 Posts
Check out my Ride(s)
Default Swirl Valve Shaft In Fill

So now that we've just made a hole in the head,
obviously we've got to fill it up


Including the shaft bushes, the bore diameter is just over 8mm
The depth is <38mm to the inlet port
So I chose a 10mm by 35mm bolt to fill the empty bore
The masking tape is set at 35mm


Drill down 35mm with an 8mm bit
Luckily the alloy is quite soft
Only had to use two taps, starter and plug


Tap the thread
Wind the tap in until the tape touches the manifold
Apply Stud Locker to the bolts
And there we have it

Last edited by ren0vator; 29-06-2017 at 06:20 PM.