The other side has these two main areas to fix.
Was going to repair just end and the right side of the mount. But then I noticed a bit of rust at the edge of the bracket.
So I thought I might as well remove the whole section.
Repaired the floor as had pitting along the edge.
Halfway through welding the patch in.
New piece welded in.
Zinc coated ready for the rail.
Rail in place.
Inside new reinforcement channel was added along with new anti crush tubes for where the A frame bolts in.