All of the above mate everything was supplied in kit.
It was fairly simple I did it in my driveway way with just basic tools, a floor jack and a block of wood. Took me about 2 hours.
-Transferase Linkage Bracket (I did away with that and installed the Novak shift cable)
-Fuel Fill Extension
-Fuel vent hose
-Radiator Relocation Bracket, ect.
2 weeks later I also installed the jks motor mount lift to help Improve rear driveline angles, (this also allowed me to do away with the
Transfer linkage bracket and the radiator relocation bracket.
|